Hotel Tru by Hilton – Grantsville, PA

PROJECT PAGE

Picture1

Project: Hotel Tru by Hilton
Construction Timeline: 2020 Completion

This project features a new 4-story hotel with 93 rooms and guest amenity spaces.  Total building square footage is over 44,000 SF.

KSG is the structural engineer of record for the modular structure.  The building superstructure is constructed with modular box wood construction.

Courtyard Marriot – Carteret, NJ

PROJECT PAGE

1

Project: Courtyard Marriott – Carteret, NJ
Construction Timeline: 2020 Completion

This project features a new 4-story hotel with 123 rooms and guest amenity spaces.  Total building square footage is over 70,000 SF.

KSG is the structural engineer of record.  The building foundation consists of shallow concrete spread footings.  The building superstructure is a hybrid structural steel and wood framed building.

23

FNCB Bank – Pittston Twp., PA

PROJECT PAGE

Project: FNCB Bank – Pittston Twp., PA
Rendering by Miller Rosentel Associates, Inc.

FNCB Bank celebrated the official grand opening of its new full-service community office at 1150 Route 315, Plains Township in June 2018 with a ribbon cutting ceremony featuring Bank staff, board members, elected officials and customers. 

The exterior design incorporates a combination of metals and natural materials on the façade which were carried through to the interior space. The modern technical elements of the bank combined with the timeless elevation make this building distinct to the area.

Keystone Structural Group provide structural engineering design services for this project.

Richland 315 Office Building

PROJECT PAGE

Project: Richland 315 Office Building – Pittston Township, PA
Rendering by Miller Rosentel Associates, Inc.

Richland 315 will feature a new glass office building totaling 53,000 SF of class A office space.  This project will be located in a prominent location between Scranton, PA and Wilkes-Barre, PA and will offer panoramic views of the Wyoming Valley.  

Keystone Structural Group provided structural engineering services for this project.  The superstructure features a steel frame with masonry shear stair and elevator tower walls used to resist lateral forces.

Construction is anticipated to begin in the summer of 2019.

Arena Hub 2018 Tornado Rebuild – Wilkes-Barre, PA

PROJECT PAGE

Project: Arena Hub 2018 Tornado Rebuild – Wilkes-Barre, PA
Damage: Approximately $18 Million
 

On June 15, 2018 an EF2 tornado struck the heart of Wilkes-Barre, Pennsylvania’s commerce center and caused at least $18 million dollars in damage.   The commercial hub is considered one of the busiest shopping centers in Northeastern Pennsylvania.
Keystone Structural Group, in conjunction with Miller Rosentel Associates, were requested by the shopping center ownership team to conduct structural survey inspections, assessment reports, repair plans and specifications for recoverable buildings.  KSG’s engineers were able to quickly determine structural soundness of the damaged buildings and provide the shopping center owner with plans to rapidly repair and reopen. 

Damaged/Impacted businesses included:

+  Dick’s Sporting Goods  +  5 Below  +  Avenue Store  +  Eddie Bauer  +  Men’s Warehouse  +   Michaels  +   Oshkosh B’gosh  +   Petsmart  +   Staples  +   TJMaxx  +  Ulta Beauty

Eco House – Shelter Island, NY

PROJECT PAGE

Project: Eco House – Shelter Island, NY
Photos by Evan Joseph
 

Our Eco House project, located off the coast of the Peconic River, between the North and South forks in Long Island, New York is complete. This spectacular project included a 2,025 sf main building with a 1,400 sf stand alone pool house. The project is green and includes electric car charging stations, solar panels, radiant heated floors and steel cantilevered canopies that provide shade on hot summer days.

Keystone Structural Group provided structural engineering services for this project.  The main superstructure of house is constructed out of concrete, the facades articulated by design to create a pattern, but mostly used for rapidity of construction, durability, and ease of upkeep. The upper portion of the Pool house is cladded with Cedar horizontal variable width and depths siding boards.

Publications:

U.S. Building of the Week (World-Architects.com)

Residential Design Publications, Vol. 3, 2019

The Saw Pit

152630643251356757 (6)

PROJECT PAGE

Project: The Saw Pit – Port Chester, NY
Construction Cost: $7 Million

The Saw Pit Apartments feature a 27 apartment unit, 4 story building, constructed over a retail space.  Total approximate square footage is 35,000 sq. ft.  Keystone Structural Group is the engineer of record.